2025 Street Improvement Project

Share 2025 Street Improvement Project on Facebook Share 2025 Street Improvement Project on Twitter Share 2025 Street Improvement Project on Linkedin Email 2025 Street Improvement Project link

Each year, the City performs maintenance on various segments of the City's road system to maximize the useful life of the pavement. The maintenance treatment can vary from crack sealing, seal coating, or patching up to complete reconstruction depending on the condition of the roadway. In order to determine the appropriate treatment, the City uses a Pavement Management Program (PMP). As part of this program, each street within the City has been surveyed, and its condition rated. Based on this rating, roadways are identified for inclusion in the City's annual Street Improvement Program and shown on the City's 10-Year Street Improvement Plan.

The 2025 Street Improvement Project affects approximately 1.8 miles of roadway. Proposed roadways to be improved are shown on the map below and include Colorado Ave., 139th St., Brunswick Ave., 137th S., Alabama Ave., Zarthan Ave., Zarthan Ct., Yosemite Ave., Xenwood Ave., 136th St., 136th Ln., and 147th St.

See below for ongoing updates for the 2025 Neighborhood Street Project. Please check back periodically.



Each year, the City performs maintenance on various segments of the City's road system to maximize the useful life of the pavement. The maintenance treatment can vary from crack sealing, seal coating, or patching up to complete reconstruction depending on the condition of the roadway. In order to determine the appropriate treatment, the City uses a Pavement Management Program (PMP). As part of this program, each street within the City has been surveyed, and its condition rated. Based on this rating, roadways are identified for inclusion in the City's annual Street Improvement Program and shown on the City's 10-Year Street Improvement Plan.

The 2025 Street Improvement Project affects approximately 1.8 miles of roadway. Proposed roadways to be improved are shown on the map below and include Colorado Ave., 139th St., Brunswick Ave., 137th S., Alabama Ave., Zarthan Ave., Zarthan Ct., Yosemite Ave., Xenwood Ave., 136th St., 136th Ln., and 147th St.

See below for ongoing updates for the 2025 Neighborhood Street Project. Please check back periodically.



  • June 3, 2025

    Share June 3, 2025 on Facebook Share June 3, 2025 on Twitter Share June 3, 2025 on Linkedin Email June 3, 2025 link

    Due to weather, the milling & reclaiming process has been delayed. The process will now begin on Friday, June 6 and be completed Saturday, June 7. No street parking during this time for large equipment to navigate through the site. We apologize for the change of schedule and appreciate your understanding.

    Please call Kale Milek at 952-292-2221 with any questions.

  • June 2 - June 6, 2025

    Share June 2 - June 6, 2025 on Facebook Share June 2 - June 6, 2025 on Twitter Share June 2 - June 6, 2025 on Linkedin Email June 2 - June 6, 2025 link
    • All remaining driveways where curb & gutter was poured will have driveway access Monday/Tuesday 6/2 & 6/3.

    • The few residents who did not have the curb poured in front of the driveway or property will be completed either 6/12-6/13 or 6/16, weather permitting and coordination between other crews’ completion. All final concrete items for the project will be completed during this time.

    • Milling/reclaim process will begin on 6/4 to be completed 6/6 weather permitting. No street parking during this time for large equipment to navigate through the site.

    • Utility crew to return on 6/9 to complete drain tile and yard drain installation on Yosemite, Xenwood, and 137th street. Storm sewer/drain tile work will also begin on 147th Street.

    • Sub cutting and street preparation on Alabama Ave (Brunswick to 135th street and north loop of 136th St, Zarthan, and 136th Lane to start 6/9-6/10). No street parking during this time and access may be impacted. Navigating through these streets may also be difficult during this operation. 2 or 3-day process weather permitting.

    Things will change but this is the tentative schedule as of now.

    Contact Kale @ 952-292-2221 with questions.

    Thank you!

  • Friday, May 23 & Monday, 5/26 - Friday, 5/30

    Share Friday, May 23 & Monday, 5/26 - Friday, 5/30 on Facebook Share Friday, May 23 & Monday, 5/26 - Friday, 5/30 on Twitter Share Friday, May 23 & Monday, 5/26 - Friday, 5/30 on Linkedin Email Friday, May 23 & Monday, 5/26 - Friday, 5/30 link

    We are doing our best to keep residents updated, but things can change fast. Thank you for your patience and understanding. Here is the latest update:

    Friday, May 23

    • Curb & Gutter placement on all of 139th Street and portions of 137th Street.

    Monday, May 26 - Friday, May 30

    • Monday - No Work - Holiday
    • Tuesday - Friday - Curb & Gutter placement on Yosemite, Xenwood Ave, 137th Street & Zarthan.

    Please contact Kale Milek @ 952-292-2221 with any questions or concerns.

  • May 22-23, 2025

    Share May 22-23, 2025 on Facebook Share May 22-23, 2025 on Twitter Share May 22-23, 2025 on Linkedin Email May 22-23, 2025 link
    • Thursday/Friday: Installation of concrete driveway panels are being installed where curb & gutter was previously replaced on 136th Street, Zarthan Ave, 136th Lane, Alabama Avenue. Street parking is extended for these residents. Curing time is typically 7 days but we will let you know if you can access sooner.

    • Installation of drain tile on 137th Street, Yosemite Avenue, & Xenwood Avenue

    Please contact City Staff, Kale Milek, at 952-292-2221 with any immediate concerns. Thank you for your patience.

  • May 19 - 23, 2025

    Share May 19 - 23, 2025 on Facebook Share May 19 - 23, 2025 on Twitter Share May 19 - 23, 2025 on Linkedin Email May 19 - 23, 2025 link

    Work for next week:

    • Installation of drain tile on 137th Street, Yosemite Avenue, & Xenwood Avenue
    • Concrete curb & gutter replacement on 137th Street, Yosemite Avenue, & Xenwood Avenue, 139th Street and Zarthan. Please park vehicles on the street if more than half of your driveway curb is being replaced. Curing time is typically 7 days but we will let you know if you can access sooner.
  • May 14, 2025

    Share May 14, 2025 on Facebook Share May 14, 2025 on Twitter Share May 14, 2025 on Linkedin Email May 14, 2025 link

    Concrete curb & gutter work expected on 136th Street, 136th Lane, Zarthan Ave & Alabama Ave. Please park vehicles on the street if more than half of your driveway curb is being replaced. Curing time is typically 7 days but we will let you know if you can access sooner.

  • May 12, 2025

    Share May 12, 2025 on Facebook Share May 12, 2025 on Twitter Share May 12, 2025 on Linkedin Email May 12, 2025 link

    Quick Update: Concrete work will be starting Wednesday, May 14 (not today).

  • May 12 - 16, 2025

    Share May 12 - 16, 2025 on Facebook Share May 12 - 16, 2025 on Twitter Share May 12 - 16, 2025 on Linkedin Email May 12 - 16, 2025 link
    • New Storm Sewer installation will take place on Zarthan Ave.
    • Yard Drains and Drain Tile will tentatively be installed on Yosemite, 137th Street, and Xenwood.
    • Concrete Curb & Gutter is expected to start on Monday, 5/12 for Colorado Ave, 139th Street, and Brunswick Ave. Access to driveways may be impacted and street parking will need to be utilized during installation and cure time. Please contact Kale Milek with any questions at 952-292-2221.
    • Concrete work will continue throughout the week. We will do our best to update.
  • May 5 - 9, 2025

    Share May 5 - 9, 2025 on Facebook Share May 5 - 9, 2025 on Twitter Share May 5 - 9, 2025 on Linkedin Email May 5 - 9, 2025 link
    • Storm Sewer installation.
    • Curb & Gutter removal & replacement.
    • Street parking required in areas where new curb was installed to allow concrete to set.
  • April 28, 2025 to May 2, 2025

    Share April 28, 2025 to May 2, 2025 on Facebook Share April 28, 2025 to May 2, 2025 on Twitter Share April 28, 2025 to May 2, 2025 on Linkedin Email April 28, 2025 to May 2, 2025 link
    • Storm sewer installation.
    • Curb and sidewalk removals.


Page last updated: 17 Jul 2025, 08:52 AM