2025 Street Improvement Project

Share 2025 Street Improvement Project on Facebook Share 2025 Street Improvement Project on Twitter Share 2025 Street Improvement Project on Linkedin Email 2025 Street Improvement Project link

Each year, the City performs maintenance on various segments of the City's road system to maximize the useful life of the pavement. The maintenance treatment can vary from crack sealing, seal coating, or patching up to complete reconstruction depending on the condition of the roadway. In order to determine the appropriate treatment, the City uses a Pavement Management Program (PMP). As part of this program, each street within the City has been surveyed, and its condition rated. Based on this rating, roadways are identified for inclusion in the City's annual Street Improvement Program and shown on the City's 10-Year Street Improvement Plan.

The 2025 Street Improvement Project affects approximately 1.8 miles of roadway. Proposed roadways to be improved are shown on the map below and include Colorado Ave., 139th St., Brunswick Ave., 137th S., Alabama Ave., Zarthan Ave., Zarthan Ct., Yosemite Ave., Xenwood Ave., 136th St., 136th Ln., and 147th St.

See below for ongoing updates for the 2025 Neighborhood Street Project. Please check back periodically.



Each year, the City performs maintenance on various segments of the City's road system to maximize the useful life of the pavement. The maintenance treatment can vary from crack sealing, seal coating, or patching up to complete reconstruction depending on the condition of the roadway. In order to determine the appropriate treatment, the City uses a Pavement Management Program (PMP). As part of this program, each street within the City has been surveyed, and its condition rated. Based on this rating, roadways are identified for inclusion in the City's annual Street Improvement Program and shown on the City's 10-Year Street Improvement Plan.

The 2025 Street Improvement Project affects approximately 1.8 miles of roadway. Proposed roadways to be improved are shown on the map below and include Colorado Ave., 139th St., Brunswick Ave., 137th S., Alabama Ave., Zarthan Ave., Zarthan Ct., Yosemite Ave., Xenwood Ave., 136th St., 136th Ln., and 147th St.

See below for ongoing updates for the 2025 Neighborhood Street Project. Please check back periodically.



  • April 21- 25, 2025

    Share April 21- 25, 2025 on Facebook Share April 21- 25, 2025 on Twitter Share April 21- 25, 2025 on Linkedin Email April 21- 25, 2025 link
    • Gate valve replacement work will continue.
    • Storm Sewer work. Expect some temporary limited access to driveways.
  • Gas Main Break

    Share Gas Main Break on Facebook Share Gas Main Break on Twitter Share Gas Main Break on Linkedin Email Gas Main Break link

    Gas leak due to construction
    CenterPoint Energy is on-site repairing a gas leak caused by construction near Alabama Ave and 137th St. If you smell a strong odor of natural gas in your home, evacuate and call 9-1-1. If you are without service or need additional information, please contact CenterPoint Energy.

  • April 14 - 18, 2025

    Share April 14 - 18, 2025 on Facebook Share April 14 - 18, 2025 on Twitter Share April 14 - 18, 2025 on Linkedin Email April 14 - 18, 2025 link
    • Watermain valve bolt replacement.
    • Storm sewer installation - expect some short-term limited access into driveways during the daytime.
  • April 9 - 14, 2025

    Share April 9 - 14, 2025 on Facebook Share April 9 - 14, 2025 on Twitter Share April 9 - 14, 2025 on Linkedin Email April 9 - 14, 2025 link

    April 9 - 14, 2025

    • Neighborhood Meeting Wednesday, April 9, 2025, from 5:00 - 6:00 p.m. / City Hall Council Chambers.
    • Installing inlet protection & traffic control signage.
    • Saw cutting of marked curbs & sidewalks will begin.
Page last updated: 21 Apr 2025, 07:27 AM