2025 Street Improvement Project
Each year, the City performs maintenance on various segments of the City's road system to maximize the useful life of the pavement. The maintenance treatment can vary from crack sealing, seal coating, or patching up to complete reconstruction depending on the condition of the roadway. In order to determine the appropriate treatment, the City uses a Pavement Management Program (PMP). As part of this program, each street within the City has been surveyed, and its condition rated. Based on this rating, roadways are identified for inclusion in the City's annual Street Improvement Program and shown on the City's 10-Year Street Improvement Plan.
The 2025 Street Improvement Project affects approximately 1.8 miles of roadway. Proposed roadways to be improved are shown on the map below and include Colorado Ave., 139th St., Brunswick Ave., 137th S., Alabama Ave., Zarthan Ave., Zarthan Ct., Yosemite Ave., Xenwood Ave., 136th St., 136th Ln., and 147th St.
See below for ongoing updates for the 2025 Neighborhood Street Project. Please check back periodically.
Each year, the City performs maintenance on various segments of the City's road system to maximize the useful life of the pavement. The maintenance treatment can vary from crack sealing, seal coating, or patching up to complete reconstruction depending on the condition of the roadway. In order to determine the appropriate treatment, the City uses a Pavement Management Program (PMP). As part of this program, each street within the City has been surveyed, and its condition rated. Based on this rating, roadways are identified for inclusion in the City's annual Street Improvement Program and shown on the City's 10-Year Street Improvement Plan.
The 2025 Street Improvement Project affects approximately 1.8 miles of roadway. Proposed roadways to be improved are shown on the map below and include Colorado Ave., 139th St., Brunswick Ave., 137th S., Alabama Ave., Zarthan Ave., Zarthan Ct., Yosemite Ave., Xenwood Ave., 136th St., 136th Ln., and 147th St.
See below for ongoing updates for the 2025 Neighborhood Street Project. Please check back periodically.
-
June 30, 2025
Share June 30, 2025 on Facebook Share June 30, 2025 on Twitter Share June 30, 2025 on Linkedin Email June 30, 2025 linkDue to weather, there will be no paving on Wednesday, July 2. More updates will be coming as we learn more.
Thank you.
-
June 30 - July 4, 2025
Share June 30 - July 4, 2025 on Facebook Share June 30 - July 4, 2025 on Twitter Share June 30 - July 4, 2025 on Linkedin Email June 30 - July 4, 2025 link- Monday, June 30 - installing concrete curb & gutter on 147th street. If we are pouring across your driveway entrance, please park on the street.
- Monday, June 30 & Tuesday, July 1 - Raising utility castings within the street
- Wednesday, July 2 - Paving Alabama, 136th St, Zarthan, 136th Ln, Brunswick, 139th (west), Colorado, 137th (west). No street parking during paving.
- No work on Thursday & Friday.
All weather permitting. Please call Kale at 952-292-2221 with any questions or concerns. Have a great holiday week.
-
June 16 - 24, 2025
Share June 16 - 24, 2025 on Facebook Share June 16 - 24, 2025 on Twitter Share June 16 - 24, 2025 on Linkedin Email June 16 - 24, 2025 link- Grading and tolerancing of the project’s roadway will begin on Monday, 6/16 and will continue through the rest of the week. No street parking during the week as the grading operator will need to blade the road base the full width of each lane.
- Utility work will continue on Yosemite Ave Monday, 6/16 and will mobilize to 147th Street to begin Storm Sewer work on 147th Street Tuesday and Wednesday, 6/17 & 6/18. Residents will have access to driveways at times, but street parking will be available on Hampshire Ave outside of the project area.
- Remaining concrete (Curb & Gutter, driveways, sidewalk, etc.), will start on Friday, 6/20 and continue through the following Tuesday, 6/24.
The schedule is continuously changing due to weather and the activities mentioned for the weeks ahead are all weather permitting.
Thank you for your patience and understanding. Please contact Kale @ 952-292-2221 with any questions or concerns.
- Grading and tolerancing of the project’s roadway will begin on Monday, 6/16 and will continue through the rest of the week. No street parking during the week as the grading operator will need to blade the road base the full width of each lane.
-
147th Street Update
Share 147th Street Update on Facebook Share 147th Street Update on Twitter Share 147th Street Update on Linkedin Email 147th Street Update linkUPDATE for 147th Street - Utility work, storm sewer/drain tile work and milling/reclaiming process will begin on Wednesday, June 11. (not today as originally planned).09 Jun 2025- The few residents who did not have the curb poured in front of the driveway or property will be completed either 6/12-6/13 or 6/16, weather permitting and coordination between other crews’ completion. All final concrete items for the project will be completed during this time.
- Complete Milling/reclaim process on 6/9. No street parking during this time for large equipment to navigate through the site.
- Utility crew to return on 6/9 to complete drain tile and yard drain installation on Yosemite, Xenwood, and 137th street.
Storm sewer/drain tile work will also begin on 147th Street. Should be complete by the end of the week, weather permitting.
- Sub cutting and street preparation on Alabama Ave (Brunswick to 135th street and north loop of 136th St, Zarthan, and 136th Lane to start 6/9-6/10). No street parking during this time and access may be impacted. Navigating through these streets may also be difficult during this operation. This is a 2 or 3-day process weather permitting.
Things may change but this is the schedule as of now.
Contact Kale @ 952-292-2221 with questions.
Thank you!
- The few residents who did not have the curb poured in front of the driveway or property will be completed either 6/12-6/13 or 6/16, weather permitting and coordination between other crews’ completion. All final concrete items for the project will be completed during this time.
-
June 9 - 13, 2025
Share June 9 - 13, 2025 on Facebook Share June 9 - 13, 2025 on Twitter Share June 9 - 13, 2025 on Linkedin Email June 9 - 13, 2025 link- The few residents who did not have the curb poured in front of the driveway or property will be completed either 6/12-6/13 or 6/16, weather permitting and coordination between other crews’ completion. All final concrete items for the project will be completed during this time.
- Complete Milling/reclaim process on 6/9. No street parking during this time for large equipment to navigate through the site.
- Utility crew to return on 6/9 to complete drain tile and yard drain installation on Yosemite, Xenwood, and 137th street. Storm sewer/drain tile work will also begin on 147th Street. Should be complete by the end of the week, weather permitting.
- Sub cutting and street preparation on Alabama Ave (Brunswick to 135th street and north loop of 136th St, Zarthan, and 136th Lane to start 6/9-6/10). No street parking during this time and access may be impacted. Navigating through these streets may also be difficult during this operation. This is a 2 or 3-day process weather permitting.
Things may change but this is the schedule as of now.
Contact Kale @ 952-292-2221 with questions.
Thank you!
- The few residents who did not have the curb poured in front of the driveway or property will be completed either 6/12-6/13 or 6/16, weather permitting and coordination between other crews’ completion. All final concrete items for the project will be completed during this time.
-
June 9 - 13, 2025
Share June 9 - 13, 2025 on Facebook Share June 9 - 13, 2025 on Twitter Share June 9 - 13, 2025 on Linkedin Email June 9 - 13, 2025 linkPlease disregard the most recent update that was sent out this morning. It was sent out in error.
My apologies.
-
June 3, 2025
Share June 3, 2025 on Facebook Share June 3, 2025 on Twitter Share June 3, 2025 on Linkedin Email June 3, 2025 linkDue to weather, the milling & reclaiming process has been delayed. The process will now begin on Friday, June 6 and be completed Saturday, June 7. No street parking during this time for large equipment to navigate through the site. We apologize for the change of schedule and appreciate your understanding.
Please call Kale Milek at 952-292-2221 with any questions.
-
June 2 - June 6, 2025
Share June 2 - June 6, 2025 on Facebook Share June 2 - June 6, 2025 on Twitter Share June 2 - June 6, 2025 on Linkedin Email June 2 - June 6, 2025 link- All remaining driveways where curb & gutter was poured will have driveway access Monday/Tuesday 6/2 & 6/3.
- The few residents who did not have the curb poured in front of the driveway or property will be completed either 6/12-6/13 or 6/16, weather permitting and coordination between other crews’ completion. All final concrete items for the project will be completed during this time.
- Milling/reclaim process will begin on 6/4 to be completed 6/6 weather permitting. No street parking during this time for large equipment to navigate through the site.
- Utility crew to return on 6/9 to complete drain tile and yard drain installation on Yosemite, Xenwood, and 137th street. Storm sewer/drain tile work will also begin on 147th Street.
- Sub cutting and street preparation on Alabama Ave (Brunswick to 135th street and north loop of 136th St, Zarthan, and 136th Lane to start 6/9-6/10). No street parking during this time and access may be impacted. Navigating through these streets may also be difficult during this operation. 2 or 3-day process weather permitting.
Things will change but this is the tentative schedule as of now.
Contact Kale @ 952-292-2221 with questions.
Thank you!
- All remaining driveways where curb & gutter was poured will have driveway access Monday/Tuesday 6/2 & 6/3.
-
Friday, May 23 & Monday, 5/26 - Friday, 5/30
Share Friday, May 23 & Monday, 5/26 - Friday, 5/30 on Facebook Share Friday, May 23 & Monday, 5/26 - Friday, 5/30 on Twitter Share Friday, May 23 & Monday, 5/26 - Friday, 5/30 on Linkedin Email Friday, May 23 & Monday, 5/26 - Friday, 5/30 linkWe are doing our best to keep residents updated, but things can change fast. Thank you for your patience and understanding. Here is the latest update:
Friday, May 23
- Curb & Gutter placement on all of 139th Street and portions of 137th Street.
Monday, May 26 - Friday, May 30
- Monday - No Work - Holiday
- Tuesday - Friday - Curb & Gutter placement on Yosemite, Xenwood Ave, 137th Street & Zarthan.
Please contact Kale Milek @ 952-292-2221 with any questions or concerns.
-
May 22-23, 2025
Share May 22-23, 2025 on Facebook Share May 22-23, 2025 on Twitter Share May 22-23, 2025 on Linkedin Email May 22-23, 2025 link- Thursday/Friday: Installation of concrete driveway panels are being installed where curb & gutter was previously replaced on 136th Street, Zarthan Ave, 136th Lane, Alabama Avenue. Street parking is extended for these residents. Curing time is typically 7 days but we will let you know if you can access sooner.
- Installation of drain tile on 137th Street, Yosemite Avenue, & Xenwood Avenue
Please contact City Staff, Kale Milek, at 952-292-2221 with any immediate concerns. Thank you for your patience.
- Thursday/Friday: Installation of concrete driveway panels are being installed where curb & gutter was previously replaced on 136th Street, Zarthan Ave, 136th Lane, Alabama Avenue. Street parking is extended for these residents. Curing time is typically 7 days but we will let you know if you can access sooner.