Each year, the City performs maintenance on various segments of its road system to maximize the useful life of the pavement. The 2024 Neighborhood Street Improvement Project will include a full-depth mill and overlay affecting approximately 2.11 miles of roadway, including:
Glenhurst Ave.
Joppa Ave.
Joppa Circle
Joppa Court
Kipling Ave.
Kipling Court
River Bend Place
144th St.
145th St.
The proposed improvement is a full-depth mill and overlay in which the bituminous pavement is either removed or reclaimed and mixed with the aggregate base. Cracked or damaged curbs will be replaced where needed. Spot repairs to the water system, sanitary system, and storm system will also be performed.
Additional traffic calming improvements are proposed for Joppa Ave. in the area of River Bend Park as part of the recommendations from the River Bend Park Engagement Plan. The improvements include:
Adding sidewalks and revising trail connections
Narrowing the street from River Bend Place to the parking lot entrance
Adding a bump out for on-street parking
Replacing the existing trail within River Bend Park
Resurfacing the parking lot
Installing lighting in the parking lot
Installing pedestrian crossings at intersections
Removing and revising street stripping to convey a more residential street feel.
Construction is anticipated to begin in May 2024 and be completed by September 2024.
Updates for the 2024 Neighborhood Street Project will be available on this page. Please check back periodically.
Each year, the City performs maintenance on various segments of its road system to maximize the useful life of the pavement. The 2024 Neighborhood Street Improvement Project will include a full-depth mill and overlay affecting approximately 2.11 miles of roadway, including:
Glenhurst Ave.
Joppa Ave.
Joppa Circle
Joppa Court
Kipling Ave.
Kipling Court
River Bend Place
144th St.
145th St.
The proposed improvement is a full-depth mill and overlay in which the bituminous pavement is either removed or reclaimed and mixed with the aggregate base. Cracked or damaged curbs will be replaced where needed. Spot repairs to the water system, sanitary system, and storm system will also be performed.
Additional traffic calming improvements are proposed for Joppa Ave. in the area of River Bend Park as part of the recommendations from the River Bend Park Engagement Plan. The improvements include:
Adding sidewalks and revising trail connections
Narrowing the street from River Bend Place to the parking lot entrance
Adding a bump out for on-street parking
Replacing the existing trail within River Bend Park
Resurfacing the parking lot
Installing lighting in the parking lot
Installing pedestrian crossings at intersections
Removing and revising street stripping to convey a more residential street feel.
Construction is anticipated to begin in May 2024 and be completed by September 2024.
Share Weekly Updates on FacebookShare Weekly Updates on TwitterShare Weekly Updates on LinkedinEmail Weekly Updates link
Updates on this project will be posted here each week. All updates are weather dependent and subject to change.
October 1, 2024
Striping will take place the afternoon of Tuesday, October 1 on Joppa Avenue and River Bend Parking Lot.
September 15, 2024
September 16 - 17, Paving wear in Phase I.
Paving wear on trail and Joppa Avenue will be towards the end of the week, weather dependent.
September 8, 2024
Restoration taking place all week.
September 1, 2024
Grading trails & parking lot on Wednesday, September 4.
Paving trails & parking lot the end of the week.
August 27, 2024
First lift of asphalt will be placed on Joppa Road Tuesday, August 28.
Concrete pouring of sidewalk Wednesday, August 29.
August 25, 2024
Grading of park trails and street.
August 18, 2024
Installation of concrete curb & gutter, and sidewalks.
Grading of trails in park.
August 11, 2024
Milling, Reclaiming & Removals of Joppa Avenue and Park Trails will begin on Monday, August 12.
During Phase 2, Joppa Avenue will be intermittently closed as needed for construction activities and safety for traffic.
August 6, 2024
A portion of Joppa Avenue will be closed today and possibly Wednesday, August 7. Traffic will be diverted to Riverbend Place and Kipling Avenue to get through the neighborhood. This area will be closed intermittently during Phase 2 as needed for construction activities and safety for traffic.
August 4, 2024
Storm Sewer construction on Joppa Avenue.
Not working Tuesday.
Watermain valve replacement on Joppa Avenue Thursday, August 8.
July 29, 2024
Phase II will be starting on Wednesday, July 31 weather permitting.
Week of July 28, 2024
Phase II will be starting on Monday, July 29 weather permitting.
Week of June 30, 2024
Phase II has a new start date of July 22 due to weather.
Early in the week, a temporary, thin layer of asphalt will be applied to the gravel intersections (Riverbend and 144th St).
Construction completion for the project is now the end of September.
Week of June 23, 2024
Phase I is now complete. Any issues or concerns, please call Engineering at 952-882-2671.
Phase II is scheduled to begin July 8, weather permitting.
Week of June 16, 2024
***IRRIGATION SYSTEMS*** Please test and verify that your system is working appropriately. Contact Engineering at 952-882-2671 with any system repairs ASAP if you have not already done so.
Continued restoration weather permitting.
If you have not already, please contact Kale about any landscaping that was existing previously before construction and removed or disturbed from construction activities. Kale will let the contractor know (952-292-2221).
Week of June 9, 2024
***IRRIGATION SYSTEMS*** Please test and verify that your system is working appropriately. Contact Engineering at 952-882-2671 with any system repairs ASAP if you have not already done so.
Insituform will be on-site this week and next to line the storm sewer lines in Phase I on Kipling Ave and Joppa Circle.
Restoration and sod to be completed and installed disturbed areas of the yards by the end of next week, weather permitting.
If you have not already, please contact Kale about any landscaping that was existing previously before construction and removed or disturbed from construction activities. Kale will let the contractor know.